Mynd
Mynd
Logo

The current fishmeal factory was built in the winter of 1998–1999. It took over from the older factory, which had been in operation at the same location since 1970. The fishmeal factory is not least important for utilising any raw material left over from processing in the freezing plant. The machinery of the fishmeal factory is continually improved to meet increasing demands concerning product quality and the prevention of pollution. A new landing depot has been built with the appropriate equipment, the repair unit and services buildings were upgraded, and fishmeal tanks have been installed. An electrically driven boiler was taken into service in 2014 so that now only a domestic source of power is utilised in the factory.